Maintenance operations of high pressure substations and power transmission lines or immediate substations of Khuzestan hydropower plants in the area of Dez, Shahid Abbaspour, Karun 3, Masjed Soleiman, Karkheh and Maroon dams are as follows:
- Reactor tests, power transformers and voltage and current transformers
- Tests of all equipment of transfer posts, above distribution and distribution
- Protection, control and measurement system tests
- AC-DC system tests and related equipment
- Communication system and telemetry tests
- Calculations and design of transmission lines, above distribution and distribution
- Studies, planning, engineering and design of post and power plant systems and ancillary equipment
Operation, installation and maintenance of power plant substations, transmission, super-distribution and distribution
- Perform thermovision operations on all post equipment
- Perform overhaul and overhaul on all equipment
- Washing insulators and equipment of transmission and distribution substations