Maintenance operations of high pressure substations and power transmission lines or immediate substations of Khuzestan hydropower plants in the area of ​​Dez, Shahid Abbaspour, Karun 3, Masjed Soleiman, Karkheh and Maroon dams are as follows:
- Reactor tests, power transformers and voltage and current transformers

- Tests of all equipment of transfer posts, above distribution and distribution

- Protection, control and measurement system tests

- AC-DC system tests and related equipment

- Communication system and telemetry tests

- Calculations and design of transmission lines, above distribution and distribution

- Studies, planning, engineering and design of post and power plant systems and ancillary equipment

Operation, installation and maintenance of power plant substations, transmission, super-distribution and distribution

- Perform thermovision operations on all post equipment

- Perform overhaul and overhaul on all equipment

- Washing insulators and equipment of transmission and distribution substations