Create date : 2022/01/13
Performing optimization operations of Shahid Abbaspour Dam in both electrical and mechanical sections is as follows:
Electrical section:
Convert dynamic excitation system to static excitation system
Design, construction and installation of power plant DCS control system
Design and implementation of 11 kV network in order to ensure the internal consumption of the power plant from the grid
Installation of generator heater elements
Installation of Vibration, Air Gap, Endwiding, Partialdischarge systems
Design and supply of two inverter charger batteries and 220V battery bank
Construction of peripheral equipment control panel
Design and modernization of Governor's control circuit
Mechanical section:
- Rehabilitation of nominal production of generators to 250 MW
- Design, manufacture and replacement of all mechanical wear parts
- Sand blasting and painting the turbine canal
- PowerPack modernization of radial gate intake valve system
- Construction of turbine platform
- Renovation of pipes, valves and fittings of cooling units and power transformers
- Service and repair of turbine, butterfly valve and radial gate servomotors
- Design and construction of turbine flood shaft assembly
- Design and manufacture of top cover generator
- Design, modification and construction of slip housing
- Design and supply of bearing oil vapor collection system and brake dust
- Installation and replacement of all instrumentation of the generator turbine
- Manufacturing air conditioners and oil coolers
- Design and replacement of central lubrication system of turbine and impeller valve
- Overhaul of the largest power plant motor (radial gate) with a length of 13 meters in the open state
- Reconstruction of 24 wicket gates
- Manufacture of all bronze and stainless steel bushes of turbine servomechanism
- Trunking the thrust bearing