The optimization operation of the 230 kV high pressure substation of Dez Dam is as follows:
- Procurement, supply, installation and commissioning of all postal equipment
- Design, construction, installation and commissioning of protection and control systems
- Design, construction and installation of PLC and RTU and installation of surge arresters and surge arresters
- Tele-protection system between Dez post and its branches (Khorramabad and Andimeshk)
- Design, construction, installation and commissioning of Marshall panels, AC-DC lighting interface and related joints
- Construction of interface room between the substation and the power plant
Construction of new main and secondary cable channels
- Replacing the bass tube of the entire keychain
- Design, purchase, installation and commissioning of battery and 220V DC charger battery for keychain