: | : | : | : | : |
Today : Mon 9 November 2026
Repair of earthen dam and Mard pass on Karun river

Create date : 2022/01/13

Piling with steel pipes at the mouth of the river
Shielding and installing blocking sheets between the piles at the mouth of the river
Excavation and earthmoving with a volume of 320,000 cubic meters on the dam body
Creating a diversion channel and controlling overflow and flood
Reinforcement of the body and ramp of the diversion channel using geotextile coating